This is the project we point people to when they ask what a complete interior remodel actually looks like. Rather than describe it, we filmed it — the whole house before demolition, and the whole house again once the last fixture was set. Both walkthroughs are below, uncut.

The house had good structure and a great lot, and almost nothing else working in its favor. Saltillo tile ran through the main living areas. A brick kiva fireplace ate the corner of the living room. The kitchen was closed off behind a wall, and a dark-stained oak wet bar sat in an alcove under a blue accent wall. Small punched windows and narrow aluminum sliders faced a pool that the house barely acknowledged.

The brief was simple to say and involved to execute: open it up, lighten it, and make the backyard feel like part of the house. What follows is what that took.

Before & After

Watch a whole home come apart and come back

We filmed this house before demolition and again after the last fixture was set. Both walkthroughs are uncut — switch between them and see the same rooms.

After — one continuous run of wide-plank oak, the dividing wall gone, a quartzite waterfall island, and floor-to-ceiling glass that finally puts the pool in the room.

Scope of Work

  • Full interior demolition of flooring, cabinetry, fixtures and the masonry fireplace
  • Removed the wall dividing the kitchen from the main living space
  • Enlarged exterior openings for floor-to-ceiling sliding glass walls to the pool deck
  • New kitchen: full-height slab cabinetry, quartzite island and perimeter counters, integrated appliances
  • Walk-in pantry built out with floating shelves and a deep prep counter
  • Wide-plank engineered oak flooring throughout the living areas
  • Complete lighting redesign — recessed cans, linear under-cabinet LED, pendant drops
  • New interior doors, casing, baseboard and flat-finish drywall throughout
  • Bathrooms reworked with new vanities, tile and fixtures

Materials & Finishes

Flooring
Wide-plank engineered white oak
Cabinetry
Full-height slab-front, light oak finish
Countertops
Book-matched quartzite, waterfall island edge
Backsplash
Full-height quartzite slab, veined to match
Island
Undermount sink, brushed-gold gooseneck faucet
Appliances
Integrated cooktop, stacked double wall ovens
Glazing
Black-framed floor-to-ceiling sliding glass
Lighting
Recessed LED, linear task strips, pendant drops
Walls
Level-4 smooth drywall, flat white

How it gets built

The sequence matters as much as the selections. Work done out of order is the most common reason remodels run long.

1 — Walkthrough and documentation

Before anything is touched we film and photograph every room. It settles disputes about what was there, it gives the design conversation a shared reference, and on a house like this it becomes the 'before' half of the story. The footage at the top of this page is that first pass.

2 — Demolition and structural opening

Interior finishes come out first — tile, cabinetry, the fireplace masonry. Removing the kitchen wall and widening the exterior openings is the point where a remodel stops being cosmetic. Anything carrying load gets temporary support and a properly sized header before the old framing comes out.

3 — Rough mechanical, electrical and plumbing

With the walls open, plumbing gets relocated for the new island and bathroom layouts, and the electrical is largely rebuilt: recessed lighting layout, dedicated circuits for the ovens and cooktop, and low-voltage runs for under-cabinet LED. This is the stage that gets inspected before anything closes up.

4 — Drywall, doors and trim

New board, taped to a smooth level-4 finish because flat paint and raking desert light are unforgiving of anything less. New interior doors, casing and baseboard go in ahead of flooring.

5 — Flooring and cabinetry

Engineered oak runs continuously through the living areas with no thresholds — a big part of why the space reads as one room. Cabinet boxes are set and scribed level, then the slab fronts are hung and aligned. Full-height cabinetry is far less forgiving than standard uppers; the reveals have to be consistent across the whole run.

6 — Stone templating and fabrication

Counters are templated only after the cabinets are set. The quartzite was slab-matched so the island waterfall and the backsplash carry the same veining — that requires laying out the cuts across the slab before fabrication, not after.

7 — Finish, fixtures and punch list

Appliances set and levelled, plumbing trim installed, lighting aimed, paint touched up. Then a walkthrough where the homeowner lists anything they want corrected, and we correct it before calling the job done.

Project Gallery

Before remodel: living room with brick kiva fireplace and saltillo tile flooring
Before — a brick kiva fireplace and saltillo tile through the main living space.
After remodel: open kitchen with quartzite waterfall island and light oak slab cabinetry
After — the dividing wall is gone and the kitchen anchors the open plan.
Kitchen cabinet boxes being set and levelled during installation
Cabinet boxes set and scribed level before the slab fronts are hung.
Bathroom stripped to exposed studs during demolition
Bathrooms taken back to studs so plumbing could be relocated for the new layout.

Design Notes

Two decisions did most of the work here. The first was continuous flooring — one material, no transitions, running from the entry through the kitchen and out to the glass. Nothing makes a house read as larger for less money.

The second was glass. Trading small punched windows for floor-to-ceiling sliders is not a cheap change; it involves structural headers and new exterior openings. But it converts a pool the house ignored into the view from the main living space, and in Arizona that is the entire argument for indoor-outdoor design.

The kitchen deliberately stays quiet. Light oak slab fronts, no hardware breaking the vertical lines, appliances integrated behind panels. The one place we let it speak is the quartzite — book-matched across the island waterfall and up the backsplash, so the stone reads as a single continuous piece of material rather than three separate surfaces.

Whole-Home Transformation — Questions

How long does a whole-home interior remodel take?

A project at this scope — full interior demolition, a structural opening, new kitchen and bathrooms — typically runs three to five months from demolition to punch list. The schedule is driven less by labor than by two things outside anyone's direct control: inspection timing and cabinet lead times. We build both into the schedule up front rather than discovering them halfway through.

Can you really remove a wall between the kitchen and living room?

Usually, yes — but it depends on whether the wall is load-bearing and what is running inside it. Load-bearing walls can come out with a properly sized header and temporary support during the work, which is engineered and permitted. The more common complication is what is hidden in the wall: plumbing stacks, HVAC trunk lines and electrical all have to be rerouted, and that is what actually drives the cost.

Do I have to move out during a remodel this size?

For a whole-home project of this scope, most homeowners do, and we generally recommend it. There is a stretch during demolition and rough mechanical where the house has no functioning kitchen, limited water and open walls. Smaller single-room remodels are a different story — those we routinely phase so the house stays livable.

Do you handle the permits?

Yes. Structural changes, relocated plumbing and new electrical circuits all require permits, and the authority depends on where the home sits — most valley cities run their own building departments, while unincorporated areas go through Maricopa County. We pull the permits and coordinate the inspections as part of the job.